Environmental Management Plan

The 2012 EMP was amended in 2014 following on completion of the Verification Study (included as one of the pre-dredging commitments in the 2012 EMP). These amendments reflect not only the  findings of the  Verification Study, but also includes the recommendations of  the Independent Peer Review team.

A draft addendum to the 2014 EMP was submitted to the Environmental Commissioner, which now incorporates additions to address the residual issues presented and discussed at the meeting held in Swakopmund (April 2016) with MET and MFMR.

 
Read:  The Environmental Management Plan (2014): Sandpiper Project


Read:  The Environmental Management Plan addendum (2016): Sandpiper Project

 