ESIA (2022)

ESIA
EMP
Peer Review

Background Information Document (2022)

Aim is to provide Interested and Affected Parties (I&APs) a background to the proposed project and to invite I&APs to register as part of the Environmental Social Impact Assessment (ESIA) process.

Scoping Report (2022)

The objective of the scoping phase was to obtain a thorough understanding of the biophysical and socioeconomic environment in which the Project is located, using baseline and specialist studies.

Environmental and Social Impact Assessment Report (2022)

ESIA Report for the Proposed Sandpiper Marine Phosphate Project within ML 170, Offshore, Namibia.

Appendix A: Environmental Management Plan (2022)

An ESIA report and environmental management plan (EMP) are required to be submitted as part of the application to support the decision-making process for issuing an environmental clearance certificate.

Appendix B: Summary: Public Consultation Process, Public & Stakeholder Meetings, & Related I&Aps Comments

Consultation is a compulsory and critical component of the ESIA process for achieving transparent decision-making and can provide many benefits. Consultation is ongoing during the entire ESIA process up to and completion and submission of final reports to the Environmental Commissioner for review in terms of the EMA 2007.

Appendix C: I&AP Comments And Responses

This document compiles all comments received during the public review period; presents the responses from ECC as the appointed environmental assessment practitioner (EAP) for the project, the Proponent and specialists engaged in the assessment.

Appendix D: Environmental Assessment Practitioner (EAP) – Team CVs

An Environmental Assessment Practitioner (EAP) is an independent consultant or firm appointed by a mining company to manage the environmental impact assessment (EIA) process and compile required documentation for a mining application.

Appendix E: Water Column Sediments & Benthos Specialist Study

Prepared by Drs Robin Carter & Nina Steffani

Appendix F: Fisheries Mammals and Seabirds Specialist Study

Prepared by D.W. Japp at Fisheries and Oceanographic Support Services

Appendix G: Independent Review by Andrew I.L. Payne

An independent review by a professional marine and fisheries scientist and journal editor, currently a member of and accredited by the Royal Society of Biology of the UK. This evaluation is undertaken without bias and in an entirely neutral capacity.

Appendix H: Socio-Economic Specialist Study (2020) by Jan De Nul

In this socio-economic assessment, local benefits resulting from the Jan De Nul-scope in the Sandpiper Phosphate Project are analysed.

Appendix I: Dredging Sediment Plume Dispersion Modelling

Prepared by HR Wallingford

Appendix I: Hydrodynamic Modelling Turbidity Thresholds Justification

Prepared by Robin Carter at Lwandle Marine Environmental Services

Appendix J: Sediment Toxicity Specialist Study

Prepared by Robin Carter at Lwandle Marine Environmental Services

Appendix K: Noise Modelling Specialist Study

Prepared by Jan De Nul

Appendix L: Phosphate Industry Socio-Economic Specialist Study (2018) by Stratecon

An economic assessment of the development of a Phosphate-Based Industry in Namibia prepared by Stratecon.

Appendix M: The ECs Scoping Report Ackowledgement Letter (2022)

Prepared by Timoteus Mufeti, the Environmental Commissioner of Namibia

Appendix N: Verification Study (2014)

This Verification Programme study was coordinated and prepared by J Midgley and Associates in accordance with reasonable professional standards and the terms of the contract agreed to between Namibian Marine Phosphate (Pty) Ltd and J Midgley and Associates.

Appendix O: Specialists CVs

CVs of the specialists who prepared the reports and studies in the ESIA (2022).